Golden Age Of Travel – 2nd May 2026

The recent dry weather had increased the risk of lineside fires, so Network Rail requested that a diesel locomotive do some of the work for us. This had to be marshalled immediately behind the tender, so some extra shunting was required before we left Stewarts Lane.

The railway line between London Bridge and Charing Cross was closed for maintenance, which meant that there was more congestion than usual in the Victoria area. We left a couple of minutes late, after allowing a late-running train to cross ahead of us into platform one. The delay had increased to about five minutes by the time that we got to Brixton, but we caught up before we passed Peckham Rye. We had a good run as far as Faversham, but we had caught up with the late-running train in front, and arrived at Dover five minutes late.

After taking on water, and pulling coal forward, we left Dover four or five minutes late, but we had caught up by the time that we reached Headcorn. The road ahead was clearer than usual because the Hastings services had been diverted via Redhill, so we were sixteen minutes early at Chelsfield.

The route for the next part of the trip was via the Catford loop rather than Herne Hill, and we got back to Victoria about a minute late.

error: Content is protected !!