This was our last trip of the year, and it was a long day for the support crew. Some of them had to start work on the fire at about three o’clock on the Saturday morning, and we didn’t get back to the shed until about one o’clock on the following morning. Because of the long day, the support crew was split into two shifts, with the servicing at Salisbury being the only time that they were both working.
After coupling up to the stock, we were several minutes late leaving Battersea Loop, but we had made up the time, and more, on arrival at Three Bridges, where we picked up our first passengers. After a further pick-up at Haywards Heath, we were about ten minutes late on arrival at our first water stop at Preston Park.
Having replenished the tender, and picked up more passengers, we were still about ten minutes late leaving Preston Park. However, we had a pathing stop at Hove, which allowed us to make up some of the deficit. By the time that we stopped at Worthing, we were only a couple of minutes late, and we had made up this time when we reached Chichester. After another water stop at Hedge End, we reached Salisbury on time – and the sun was shining.
We came off the train at Salisbury, and the Class 47 diesel, which had been on the back so far, took the train to Bristol, while we serviced Clan Line.
We were made very welcome in the PW depot, where the engine was serviced. Once the fire had been cleaned, and other servicing jobs attended to, we moved back into the station, where we waited in platform five for the return of the train. While we were here, we had lots of interested visitors to the footplate.
When the train arrived from Bristol, we coupled up to it, and then turned the whole train on the triangle. We were a few minutes late at this point, but had caught up most of it by the time that we approached our birthplace of Eastleigh. Unfortunately, we were then held for a late-running service train, which delayed us all the way to our water stop at Botley. This went well, but we then had to follow another late-running service train. We weren’t able to make up any time until we got to our next water stop at Preston Park. We saved several minutes here, but our return to Three Bridges was still about eight minutes late.
Our work was not finished, though, as we still had to get back to Stewarts Lane and dispose the engine.
And the work will continue, as we are now starting on our annual maintenance period.

















